摘要
介绍了汶川地震断裂带科学钻探项目的钻探工程实施情况,包括完成的钻孔情况、钻探施工中遇到的技术难题,以及为解决这些难题开展的钻探技术研发和钻探工程的组织管理等。
This article introduces the general information on the drilling engineering of Wenchuan earthquake fault scientific drilling project,including the results of borehole completion,technical problems encountered in drilling operation and research and development efforts for resolving technical problems. In addition,the organization and management of the drilling engineering is also discussed.
出处
《探矿工程(岩土钻掘工程)》
2014年第9期94-100,共7页
Exploration Engineering:Rock & Soil Drilling and Tunneling
基金
科技部科技支撑计划专项"汶川地震断裂带科学钻探(WFSD)"项目之"科学钻探与科学测井"课题
中国地质调查局地调项目"破碎和强缩径地层大直径深孔取心钻进技术研究"(1212011120258)
"定向钻进技术在西部地区大直径深孔钻探中的应用"(12120113097600)
"地震断裂带复杂地层钻探施工技术应用示范"(12120114075701)
关键词
地震
科学钻探
钻探工程
汶川
earthquake
scientific drilling
drilling engineering
Wenchuan