摘要
针对双护盾TBM因洞外电气原因影响掘进的几个问题进行了阐述,对今后TBM在施工过程中避免出现类似问题、减少TBM停机时间、保证TBM正常运行提供借鉴。
In this paper,some problems in TBM's outside tunnel electrical equipment which influence double shield TBM excavation,are discussed.This provides references for avoiding the similar problems in later TBM construction,reduces TBM shutdown time and ensures normal operation of TBM.
出处
《四川水力发电》
2014年第4期30-32,共3页
Sichuan Hydropower
关键词
CCS项目
TBM洞外电气
运行
维护
CCS project
outside tunnel electrical equipment for TBM
operation
maintenance