大地压影响下出水钻孔封堵技术研究 被引量:6

Research of sealing technique of water inrush borehole under high ground pressure
下载PDF
导出
摘要 邢东矿1127工作面35号底板超前钻孔发生出水事故,疏放一段时间后,水量衰减程度较小,且孔口四周底板开始出水,严重影响矿井的安全生产,需对出水钻孔立即进行封堵。针对该出水钻孔封堵的难点,采取"三步走"的封堵方案对出水钻孔实现了封堵,封堵率达到100%,首次完成了大地压(10 MPa)条件下的出水钻孔封堵,为邢东矿的正常生产接替提供了保障。 The water inrush accident happened at No.1127 working face when drilling on No. 3 5 floor in advance.After water drainage for a time,the water volume decreased little,and the water began to inrush around the borehole,which severely disturbed the safety production in coal mine and the boreholes should be sealed immediately.In view of the difficulties in sealing water inrush boreholes,the three-step sealing proj ect was carried out.The sealing success rate reached up to 100 %.The water inrush borehole sealing under high ground pressure (10 MPa)was firstly achieved,providing a strong guarantee for normal production in Xingdong Coal Mine.
作者 高春芳 李冲
出处 《中国煤炭》 北大核心 2014年第9期102-103,共2页 China Coal
关键词 大地压 出水钻孔 封堵技术 效果检验 high ground pressure water inrush borehole sealing technique validity test
  • 相关文献

参考文献1

二级参考文献6

共引文献8

同被引文献44

引证文献6

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部