摘要
介绍了某炼油厂因新增烟气脱硫脱硝装置引起余热锅炉炉膛的压力提高而进行的改造以及对余热锅炉低负荷工况运行、排烟温度过高、烟气泄漏等问题进行改造的情况。
The transformation of catalytic cracking unit in the refinery of flue gas desulfurization and denitration device for the pressure improvement of waste heat boiler furnace are introduced.The transformation and ascension of the whole of the waste heat boiler under low load operation,the high exhaust gas temperature,and the flue gas leakage problem are introduced as well.
出处
《石油化工设备》
CAS
2014年第5期108-111,共4页
Petro-Chemical Equipment
关键词
余热锅炉
烟气脱硫脱硝
水封式防爆门
烟气密封
改造
waste heat boiler
flue gas desulfurization and denitrification
explosion-proof door of water sealed
seal of flue gas
improvement