摘要
涡北选煤厂是大型群矿型选煤厂,设计的洗选系统较多,且各个水循环系统相对独立,由此室外管道较多,且各单体建筑距离相对较远,各单体建筑间的联结管道也较长。在设计过程中发现室外管道完全按规范设计很难实现,只能因地制宜进行设计,按先下原则布置管道,以达到最适合现场的目的。
Wobei coal preparation plant is a large coal preparation plant, more washing system, and all the water circulation system is relatively independent, the outdoor pipeline is more, and each single building is relatively far away from the connection pipeline of each single building. In the design process, found it is very dififcult to achieve for outdoor pipe to design strictly according to the standard, only by adjusting measures to local conditions, according to the ifrst principles of layout of pipeline, in order to achieve the most suitable for the purpose.
出处
《山东煤炭科技》
2014年第10期122-123,共2页
Shandong Coal Science and Technology
关键词
室外
管道
设计
布置
outdoor
pipeline
design
layout