期刊文献+

基于挤压算法的集装箱码头泊位与岸桥联合调度优化 被引量:9

Extrusion algorithm-based optimization of berth and crane joint scheduling at container terminal
原文传递
导出
摘要 为获取合理的集装箱码头泊位-岸桥分配方案,基于连续泊位与岸桥联合调度问题,建立以最小化船舶在港时间和最大化岸桥利用率为目标的模型,并针对该模型设计了启发式算法——挤压算法,将泊位-岸桥联合调度看作二维装箱问题,通过挤压船舶在二维坐标图中的空隙来缩短船舶在港时间.算例分析表明,本文构建的模型和算法可有效缩短船舶在港时间,提高岸桥利用率. In order to get reasonable distribution plan for berth-gantry cranes of the container terminal , this paper es-tablished an optimization model of the target ship to minimize the time in port and maximize the utilization of quay crane based on continuous berths and gantry cranes coordinated scheduling problem .And according to the model , this paper designed a heuristic algorithm - extrusion algorithm , which regarded berth-crane coordinated scheduling problem as a two-dimensional packing problem .And it did this by squeezing the ship in the gap in the two-dimensional plot to shorten the time of the vessels in the harbor. Example analysis shows that the model and algorithm constructed in this paper can effec-tively shorten the time of the ship in the harbor , so as to im-prove the utilization of quay crane .
出处 《大连海事大学学报》 CAS CSCD 北大核心 2014年第3期8-12,共5页 Journal of Dalian Maritime University
基金 大连市科技计划资助项目(20120275) 中央高校基本科研业务费资助暨大连海事大学优秀科技创新团队培育计划资助项目(2011ZD027)
关键词 集装箱码头 联合调度 挤压算法 container terminal coordinated scheduling ex-trusion algorithm
  • 相关文献

参考文献8

二级参考文献71

共引文献132

同被引文献59

  • 1李彤,王春峰,王文波,宿伟玲.求解整数规划的一种仿生类全局优化算法——模拟植物生长算法[J].系统工程理论与实践,2005,25(1):76-85. 被引量:145
  • 2刘富强.天津港深水泊位移位疏浚工艺研究与应用[J].水道港口,2006,27(4):241-242. 被引量:1
  • 3周鹏飞,康海贵.面向随机环境的集装箱码头泊位-岸桥分配方法[J].系统工程理论与实践,2008,28(1):161-169. 被引量:56
  • 4L! C L, CAI X, LEE C Y. Scheduling with Multiple-Job- On-One-Processor Pattem[ J ]. IE Transactions, 1998, 30 : 433 -445.
  • 5GUAN Y,XIAO W Q, CHEUNG R K,et al. A Multipro- eessor Task Scheduling Model for Berth Alloeation:Heu- ristie and Worst-Ease Analysis [ J ]. Operations Research Letters, 2002,30 ( 5 ) : 343 -350.
  • 6AK A, ERERA A L. Simultaneous Berth and Quay Crane Scheduling for Container Ports [ R ]. Georgia Institute of Technology, 2006.
  • 7LIANG Chengji, HUANG Youfang, YANG Yang. A Quay Crane Dynamic Scheduling Problem by Hybrid Ev- olutionary Algorithm for Berth Allocation Planning [ J ]. Computers & Industrial Engineering, 2009, 56: 1021- 1028.
  • 8BIRGER R W, DULLAERT R, SCHAEREN V. An En- riched Model for the Integrated Berth Allocation and Quay Crane Assignment Problem [ J ]. Expert Systems with Applications ,2011,38 : 14136-14147.
  • 9YANG Chunxia, WANG Xiaojun, LI Zhenfeng. An Op- timization Approach for Coupling Problem of Berth Allo- cation and Quay Crane Assignment in Container Terminal [ J ]. Computers & Industrial Engineering, 2012, 63 : 243-253.
  • 10YAVUZ B T, TASKIN Z C, NECATI A, et al. Optimal Berth Allocation and Time-Invariant Quay Crane Assign- ment[ J]. European Journal of Operational Research in Container Terminals, 2013, 1-14.

引证文献9

二级引证文献26

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部