锦屏二级水电站1号引水隧洞绿泥石片岩洞段监测成果初步分析 被引量:3

Data analysis on chlorite schist tunnel section of the diversion tunnel No.1 of Jinping Ⅱ hydropower station
下载PDF
导出
摘要 绿泥石片岩具有强度及弹性模量等力学参数较低、遇水软化效应明显的特点,易出现围岩持续变形、支护结构损坏、大规模塌方等破坏情况。通过对锦屏二级水电站1号引水隧洞绿泥石片岩洞段围岩变形、支护和衬砌结构应力应变及衬砌外水压力监测成果的初步分析,了解该洞段的工作状态,为1号引水隧洞的安全评价提供科学依据,为类似工程提供参考。 Continuous deformation, support structure damage and large scale collapse are always found with the chlorite schist because of its characteristics of low strength, elastic modulus and water-weaken- ing impact. For the diversion tunnel No. 1 of Jinping Ⅱ hydropower station, monitoring of surrounding rock deformation, stress-strain on the support and lining structure as well as external water pressure on the lining structure was carried out. Based on analysis of monitoring data, the working behavior of the chlorite schist tunnel section was understood to evaluate the Safety of the diversion tunnel No. 1 and pro vide reference to similar projects.
出处 《大坝与安全》 2014年第4期37-42,48,共7页 Dam & Safety
关键词 引水隧洞 绿泥石片岩 安全监测 分析 diversion tunnel chlorite schist safety monitoring analysis
  • 相关文献

参考文献4

二级参考文献2

  • 1南京水利科学研究院勘测设计院,常州金土木工程仪器有限公司.岩土工程安全监测手册(第二版)[M].北京:中国水利水电出版社,2008.
  • 2锦屏建设管理局安全监测管理中心(锦屏二级).雅砻江锦屏二级水电站1号引水系统工程专项安全鉴定施工期安全监测成果初步分析报告[R].2012.

共引文献1

同被引文献49

引证文献3

二级引证文献34

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部