摘要
通过理论分析,考虑实际运行中的各个因素,研究清江梯级水库联调中高坝洲的上游水位控制:电价因素、综合效率系数、测价规模电量等问题,从而总结出具有指导意义的结论。
The control of upstream water level in Gaobazhou hydropower station is analyzed under a united dispatching of cascade hydropower stations in Qingjiang river. The influencing factors in practice considered in the analysis includes the electrical power price,coefficient of overall efficiency,etc. Some useful conclusions are made.
出处
《水电与新能源》
2014年第9期27-28,35,共3页
Hydropower and New Energy
关键词
水位控制
发电效益
弃水风险
water level control
benefit of power generation
risk of surplus water