摘要
富拉尔基热电厂取水泵站维修工程中使用了水下不分散硅粉混凝土对采用护岸混凝土灌注桩形式的进水前池两翼挡土墙进行补强加固,实践证明,该施工工艺非常适合对该类水工构造物侵蚀破坏的修补维护。
In the repairing project of water-inlet pumping station of Fulaerji thermal power station,the underwater nondispersive silica fume concrete is adopted in the reinforcement of concrete bored pile revetment of the forebay. Practice shows that such technology is quite suitable for the repairing work of hydraulic structures subject to erosion.
出处
《水电与新能源》
2014年第9期36-37,42,共3页
Hydropower and New Energy
关键词
水下不分散硅粉混凝土
补强加固
护岸灌注桩
underwater non-dispersive silica fume concrete
reinforcement
bored pile revetment