期刊文献+

提高青城子铅锌矿银回收率试验研究 被引量:1

Experimental research of improving silver recovery rate of Qingchengzi Lead-zinc Mine
下载PDF
导出
摘要 青城子铅锌矿铅精矿含银1 200g/t左右,银回收率75%。按现场生产流程和药剂制度进行对比试验,磨矿细度由-0.074mm占50%提高到60%,尾矿中银由7g/t降到5g/t;降低再磨细度,硫精矿含银量减少,银回收率由原来的75%提高到81%。 The silver content in lead concentrate of Qingehengzi Lead-zinc Mine is around 1 200g/t, and the recovery rate of silver in lead concentrate is 75%. The experiment process and reagent system was the same as the production. The loss of silver in tailings declined from 7g/t to 5g/-t after reducing the grinding fineness from 50% -0. 074mm to 60% -0. 074mm. The silver content in sulfur concentrate decreased and the silver recovery rate in lead concentrate increased from 75% to 81% while the regrinding fineness was reduced.
出处 《中国矿山工程》 2014年第5期23-26,共4页 China Mine Engineering
关键词 铅锌矿 银回收率 试验研究 lead-zinc mine silver recovery rate experimental research
  • 相关文献

同被引文献54

引证文献1

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部