期刊文献+

交通装备售后绩效保障系统控制策略研究 被引量:1

Control Polices on After-sale Performance-based Support System for Transportation Equipment
下载PDF
导出
摘要 针对装备售后保障逐渐向绩效保障模式转变的趋势.文章研究绩效模式下的交通装备售后保障系统控制策略,分析部件损耗特征并给出不同模拟情境下的最优控制策略;首先,从仓库备件库存出发推导出备件库存水平状态概率分布,并获得如可用度等系统绩效性能指标,然后,建立绩效约束的保障系统优化模型并设计出有效的遗传算法;最后,进行数值实验;结果表明,平均故障间隔时间对保障系统控制策略的影响大,而备件可修复率对保障系统控制策略的影响较小。 After-sales support of equipments has the trend of shifting to the performance-based support pattern gradually. This paper studies control polices on transportation equipment support system under performance-based contract, analyzes the spare parts loss characteristics and presents the optimal control polices in different simulation situations. Firstly, the steady-state probability distributions of inventory level at spare parts warehouse are derived and several important performance measures are obtained, such as system availability. Then an optimization model with performance constrained is setup and an efficient genetic algorithm is proposed. Finally, several numerical experiments are performed. The results shown that the average time between failures has much more effect on the optimal control strategy than the repair rate of the spare parts.
出处 《计算机测量与控制》 北大核心 2014年第9期2810-2812,共3页 Computer Measurement &Control
基金 中国博士后科学基金(2013M542269) 西南民族大学中央高校专项资金(13NZYTD21) 国家社科基金(13CGLl51)
关键词 交通装备 绩效保障 遗传算法 备件 transportation equipment performance-- based contract genetic algorithm spare parts
  • 相关文献

参考文献4

  • 1Sherbrooke C C. METRIC: A multi-echelon technique for recover-able item control [J], Operations Research, 1968,16 .1): 122-141.
  • 2Axsater S. A heuristic for triggering emergency orders in an inven-tory system [J]. European journal of operational research, 2007,176 (2): 880 - 891.
  • 3盛天文,陈晓慧,易树平.寿命型设备的预防维修策略研究[J].计算机集成制造系统,2009,15(3):598-603. 被引量:22
  • 4Phillips E. H. Performance based logistics: a whole new approach[J]. Aviation Week and Space Technology, 2005,163 (17) : 52-55.

二级参考文献10

  • 1刘宝友,方攸同,魏金祥,王永亮.状态维修机械设备的可靠性和检测更换策略[J].机械工程学报,2006,42(3):30-35. 被引量:20
  • 2NAKAGAWA T. Optimal policy of continuous and discrete replacement with minimal repair at failure[J]. Naval Research Logistics Quarterly, 1984, 31(4) :543-550.
  • 3CANFIELD R V. Cost optimization of periodic preventive maintenance[J]. IEEE Transactions on Reliability, 1986, 3 (1) 78-81.
  • 4SHEU S, GRIFFITH W S, NAKAGAWA T. Extended optimal replacement model with random minimal repair costs[J].European Journal of Operational Research, 1995, 85 (3): 636-649.
  • 5MALIK M A K. Reliable preventive maintenance policy[J]. AIIE Transaction, 1979, 11(3):221-228.
  • 6NAKAGAWA T. Sequential imperfect preventive maintenance policies[J]. IEEE Transactions on Reliability, 1988, 37(3):295-298.
  • 7ZHOU X J, XI L F, LEE J. Reliability centered predictive maintenance scheduling for a continuously monitored system subject to degradation[J]. Reliability Engineering and System Safety, 2007, 92(4):530 534.
  • 8ETI M C, OGAJI S O T, PROBERT S D. Reducing the cost of preventive maintenance(PM) through adopting a proactive reliability-focused culture[J]. Applied Energy, 2006, 83(11) : 1235-1248.
  • 9CHAREONSUK C, NAGARUR N, TABUCANON M T. A multi-criteria approach to the selection of prevention maintenance intervals[J]. International Journal of Production Economics, 2006, 49(1):55-64.
  • 10LAI K K, LEUNG F K N, TAO B, et al. Practices of preventive maintenance and replacement for engines:a case study [J]. European Journal of Operational Research, 2001, 124 (2) : 294-306.

共引文献21

同被引文献1

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部