摘要
杭甬高速铁路道岔板采用混凝土预制式生产工艺。以此为背景,介绍了相对应的关键生产技术。实践表明,该技术的实施可以保证制品质量、提高生产效率、降低成本,为以后类似的高速铁路预制板工程提供了宝贵的经验。
Switch board of Hangzhou-Ningbo high-speed railway project uses prefabricated concrete production process. Taking it as background, this paper introduces key product technique in such process, which ensues product's quality, improves production effi ciency, and reduces cost in practice, providing precious experience for similar high speed railway precast slab engineering.
出处
《建筑施工》
2014年第9期1078-1079,共2页
Building Construction
关键词
高速铁路
无砟轨道
预制
道岔板
high-speed railway
non-ballasted track
prefabricated
switch board