摘要
针对一起动力站总变全所失压的事故,提出动力站电源负荷调整方案,将动力站开闭所Ⅰ、Ⅱ段电源移到炼油总变,并增加一条备用电源备自投,以确保动力站锅炉及水处理系统正常运行。
The adjustment scheme of power load in power station is proposed based on an accident of station totally loss of pressure. The I, II segment of switching station of power station are moved to the refinery main station. An automatic switch power is added in the system. The normal operation of power station boilers and water treatment systems are guaranteed.
出处
《自动化应用》
2014年第8期113-114,共2页
Automation Application