4Reilly J., Brown J.Management and Control of Cost and Risk for Tunneling and Infrastructure Projects [J]. Tunneling and Underground Space technology, 2004(19):330
5Reilly J., Brown J.Management and Control of Cost and Risk for Tunneling and Infrastructure Projects[A]. Proceedings of World Tunnel Congress and 13th ITA Assembly[C]. B18. Singapore, 2004
6Eskesen S. D., Tengborg P., Kampmann J. et al. Guidelines for Tunnelling Risk Management: International Tunneling Association, Working Group No.2 [J]. Tunneling and Underground Space Technology, 2004,(19):217~237
7许燕峰.地铁土建工程风险分析与控制[J].市政技术,2004,22:61-64.
8Faber M.H., Stewart M.G.Risk Assessment for Civil Engineering Facilities: Critical Overview and Discussion [J]. Reliability Engineering & System Safety. 2003(80):173~184
9Shen L. S.Project Risk Management in Hong Kong [J]. International Journal of Project Management,1997, 15(2):101~105
10Al-Bahar J. F.Systematic Risk Management Approach for Construction Projects[J]. Journal of Construction Engineering and Management,1990, 116(3):533~546