摘要
在建设项目日益复杂的情况下,针对某些复杂工序的方案验证仅通过简单的虚拟施工浏览无法进行有效的论证,通过Delmia的DPM/DPE模块,可以将前端三维表现和后台施工工艺数据库相结合,根据施工模拟方案生成各种分析报告以供施工方案决策分析。
As the construction project is more complex, it can't effectively verify some complex construction process only through simple virtual construction browsing, by the DPM/DPE module of Delmia, we can combine the front 3D performance and back construction technology database, according to the construction simulation scheme, it can generate a variety of anaiysis reports for the decision of construction scheme.
出处
《机电产品开发与创新》
2014年第5期82-83,41,共3页
Development & Innovation of Machinery & Electrical Products