隧道三维点云施工监测技术与应用 被引量:13

3D Point Cloud Monitoring Technology and its Application in Tunnels
下载PDF
导出
摘要 隧道工程作为特殊的地下工程构筑物,施工过程具有很大的难度和风险,对施工过程进行信息化监测十分重要。采用三维激光扫描测量技术,通过三维点云测量,可以进行隧道开挖过程与模型对比分析、变形对比分析和侵限对比分析,及时地掌握隧道施工过程中隧道的沉降和收敛情况、隧道结构的受力和变形情况,为及时调整支护参数、确定二次衬砌最佳时机和修改设计提供可靠的依据;并可依监测成果进行隧道施工安全风险预警预报和风险分级管理。工程实践表明,三维激光扫描系统具有速度快、精度高等优点;测量结果与Leica TPS1200全站仪对比表明,精度符合规范规定的相关要求,数据十分接近。 Underground engineering is full of difficulties and risks during tunnel construction,and observational monitoring is becoming more and more important in the course of tunneling construction.Using 3D laser scanning measurement technology,and based on 3D point cloud monitoring,a comparative analysis is carried out in terms of the tunnel excavation process,deformation,and clearance intrusions,the purposes of which are:(1) to trace tunnel settlement,convergence,stress and deformation;(2) to provide a dependable basis for adjusting the support parameters,installing the secondary lining at an optimum time,and modifying the design scheme; and(3) to provide early warning and alarms and risk management based on monitoring results.Engineering practices indicate that the 3D laser scanning system is characterized by high speed and high precision,and its measurement precision meets the specified requirements with the data being very close to that of the Leica TPS1200 total station.
出处 《现代隧道技术》 EI 北大核心 2014年第5期199-204,共6页 Modern Tunnelling Technology
基金 国家科技部"十一五"科技支撑项目(2006BAJ27B04) 北京市教委科技计划面上项目(KM2012108530058)
关键词 隧道施工监测 坐标转换 预警预报 信息化 Tunnel construction monitoring Coordinate transformation Early warning and alarms Informatization
  • 相关文献

参考文献14

  • 1Kim Jung-Ryul, Yoo Hyun-Suk, Kwon Soon-Wook, Cho Moon-Young. Integrated Tunnel Monitoring System Using Wireless Au- tomated Data Collection Technology [A]. Proceedings of the 25th International Symposium on Automation and Robotics in Con- struction [C]. Vilnius, 2008.
  • 2邓洪亮,陈凯江,朱明岩,邓启华.隧道监控量测三维激光扫描方法与应用研究[J].测绘通报,2012(S1):123-125. 被引量:22
  • 3马士伟,韩学诠,廖凯.浅埋大断面黄土隧道防塌方实时监测预警[J].现代隧道技术,2014,51(2):11-15. 被引量:21
  • 4饶军应,傅鹤林,黎明,刘运思,尹泉,张海明.白山隧道塌方处治技术及其监测结果分析[J].现代隧道技术,2014,51(2):157-166. 被引量:27
  • 5邓洪亮,杨玉杰,高文学,周世生,付孝银,倪婷婷.隧道施工监控与预警系统应用研究[J].施工技术,2011,40(2):54-56. 被引量:11
  • 6Hongliang Deng, Kaijiang Chen, Qihua Deng, et al. The Data Management System of Tunnel Monitoring [A]. 2012 International Conference on Computer-aided Material and Engineering (ICCME 2012) [C]. Advanced Materials Research, 2012.
  • 7Hongliang Deng, Qihua Deng, Kaijiang Chen, Chenggang Zhu, Tingting Ni, Mingyan Zhu. 3-D Tunnel Clearance Measurement Technology and Application Based on Reverse Engineering [A]. 2012 International Conference on Smart Technologies for Materials and Communication (ICSTMC2012) [C]. Advanced Materials Research, 2012.
  • 8Hongliang Deng, Xiao-yin Fu. The Advanced Prediction and Emergency Management Technique on Construction of Shallow Buried Large Section Bedding Rock Unsymmetrical Loaded Tunnel [A]. Proceedings of the Eleventh International Symposium on Structural Engineering [C]. 2010:17551760.
  • 9Wang Qingbo, Yuan Jingling, Zhong Luo. The Architecture of City Tunnel Monitoring Platform [A]. The 2nd International Confer- ence on Consumer Electronics, Communications and Networks in 2012 [C]. 2012:640-642.
  • 10S. J. Gordon, D. D. Lichti, M. P. Stewart and J. Franke. Modeling Point Clouds for Precise Structural Deformation Measurement [J]. International Archives of Photogrammrtry and Remote Sensing, 2004, 35 (7): 954-959.

二级参考文献44

共引文献188

同被引文献124

引证文献13

二级引证文献45

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部