摘要
针对传统方式通过三山岛金矿F3断裂带存在的诸多不足,采用超前导水预支护新技术通过F3断裂带。通过阐述该技术施工方案及过程,并结合实际的应用效果,论证了该新技术通过F3断裂带的可行性和优势。
The main construction organization of traditional F3 fault zone has many shortage.The new technology of advancing water diversion pre-support quickly passing through F3 fault zone is adopted.The paper presents the construction scheme and process of this technology.With the combination of the real application effect,the paper discusses the feasibility and advantages to use this technology passing through the F3 fault zone.
出处
《矿业工程》
CAS
2014年第5期8-11,共4页
Mining Engineering
关键词
F3断裂带
超前导水
预支护
新技术
F3 fault zone
advancing water diversion
pre-support
new technology