RB试验是机组协调控制中的难点,针对1台已完成送风、引风和给水泵RB试验的670MW机组,分析超临界机组RB试验几个关键点的控制方法,为完善机组RB控制策略和提高机组RB成功率提供参考。
The RunBack test is always difficult in the unit coordinated control. According to a 670 MW unit with completed forced draft fan RB,induced draft fan RB and feed water pump RB test,several key points of supercritical units RB test control methods were analysed and summarized to improve the control strategy of units RB and the success rate,it has a strong practical significance.
出处
《电力科技与环保》
2014年第5期57-58,共2页
Electric Power Technology and Environmental Protection
关键词
RB
超临界机组
控制策略
RB
supercritical unit
control strategy