3IEC 61850: Communication networks and system in substations, part 5[S]. 1999.
4IEC 61850: Communication networks and system in substations, part 1 to part 10 [S]. 1999.
5UCA 2.0 Standard Document. UCATM profiles; draft 1.1, copyright electric power research institute (EPRI)[S]. 1998.
6Haud J, Janz A, Rudolph T et al. A pilot project for testing the standard drafts for open communication in substations-First experiences with the future standard IEC 61850[DB/OL]. http://www.tde.alstom.com/p-c/ftp/docs/vavers/PO~5TRE ~f.
7ISO/IEC 9506. Industrial automation systems manufacturing message specification[S].
8B Yi, A Cruden, J R Mcdonald, et al. A Novel Bulk-glass Optical Current Transducer Having an Adjustable Multi-Ring Optical Path[A]. IEEE Instrumentation and Measurement Technology Conference[C], Ottawa, Canada, 1997.
9U Holm, H Sohlstrom, T Brogardh. Measurement System for Magneto-optic Sensor Materials[J]. J Phys. E: Sci. Instruments,1984, 17: 885-889.
10Ning Y N, Wang Z P, A W Palmer, et al. Recent Progress in Optical Current Sensing Techniques[J]. Review of Science Instruments, 1995, 66(5): 3097-3111.