摘要
邢东矿1223工作面地质条件极其复杂,工作面上下巷共穿过断层16条,其中落差最大的为8 m。对此艰难条件下开采展开研究,并成功研究出复杂地质条件下综采工作面带采技术,通过实践表明,此技术的运用,使工作面带采多采出煤炭12 000 t,为煤矿创造了极大经济效益和社会效益。
1223 working face of Xingdong Mine was with extremely complicated geological conditions, the fault was 16 up and down the lane in working face, one of the biggest gap was 8m. Ming under this hard condition was studied, fully mechanized mining face with mining technology was successfully designed, the practice showed the application of the technology made working face with mining produce another 12, 000 t coal, which created great economic and social benefits for mines.
出处
《煤炭与化工》
CAS
2014年第9期41-43,共3页
Coal and Chemical Industry
关键词
复杂地质条件
综采工作面
带采技术
complex geological conditions
fully mechanized working face
with mining technology