摘要
大庆石化公司热电厂4#汽轮机组负胀差值超标,文中分析了该机组运行状况和参数,对机组汽封漏汽及热力系统管路进行合理改造,解决了机组负胀差超标及六段抽汽超温问题,保证机组安全平稳运行。
The negative differential expansion of turboset in the thermal power plant was off-standard. The condition and parameters of this turboset was analyzed in this paper,reasonable modification was made to gland leak-off and thermal system pipeline,the problems of off-standard turboset’s negative differential expansion and the sixth extraction opening overheating were solved and the safe and smooth operation of the turboset was ensured.
出处
《炼油与化工》
2014年第5期30-32,62,共3页
Refining And Chemical Industry
关键词
负胀差
汽封漏气
抽汽温度
汽轮机
negative differential expansion
gland leak-off
extraction temperature
steam turbine