变电站是电力系统的重要组成部分,是进行变电与配电的主要场所,变电站电气设备安装质量关系到整个电力系统能否正常安全运行。由于在变电站电气安装过程中涉及设备品种繁多、安装调试程序复杂,一些问题会凸显出来,本文分析了变电站电气安装过程中的常见问题,针对存在的问题提出了相应解决措施,旨在为变电站电气安装调试提供借鉴经验。
Transformer substation is the important component of electric power system,and is the main place for transferring and distributing power.The quality of assembling electric equipments in transformer substation can determine whether the whole electric system is operating normally or not.Because there are various types of equipments and assembly and commissioning programs involved in the process of electric assembly for transformer substation,some problems become prominent.This paper analyzes common problems during electrical installation process of transformer substation and comes up with corresponding solution measures,aiming at providing reference experiences for electric assembly and commissioning of transformer substation.
出处
《中国水能及电气化》
2014年第9期38-40,44,共4页
China Water Power & Electrification
关键词
变电站
电气
安装调试
问题
对策
transformer substation
electricity
assembly and commissioning
problem
countermeasure