彭湖高速连接公路的病害调研与整治

Survey and Control of Diseases on Connection Line of Pengze-Hukou Highway
下载PDF
导出
摘要 彭湖高速连接公路由于特殊原因,交通量激增,严重超载,路面路基病害较为严重。全线包含沥青混凝土路面和混凝土路面两种路段。在公路整治设计中,针对两种路面特性和路面路基病害情况,综合考虑社会、工程和经济因素,研究出不同的路面和路基整治方案。采用方案一对其进行整治,效果较好,己投入使用。 The connection line of Pengze-Hukou Highway is for special reasons,such as traffic surge and serious overloading,subject to severe diseases on the pavement and subgrade.The whole line includes two types of section with asphalt concrete pavement and concrete pavement.Thus the highway renovation design,in relation to the performance of the two types of pavement and the conditions of the pavement and subgrade diseases,considered the social,engineering and economic factors comprehensively and found out different schemes for the pavement and subgrade treatment.The schemes show good effect in treatment and then have been put into service.
出处 《路基工程》 2014年第5期232-236,共5页 Subgrade Engineering
关键词 严重超载 病害调查 整治措施 serious overloading disease survey control measures
  • 相关文献

参考文献7

二级参考文献22

共引文献100

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部