摘要 针对外海风高、浪大的建设条件,跨海桥梁大型基础采用"工厂预制、现场安装"的施工工艺,有效减少了海上作业时间,同时提高了施工工效。文中以港珠澳大桥非通航孔桥装配式基础为例,主要从预制墩台整体安装以及桩与承台连接部位的关键施工技术对基础装配化施工进行了详细的阐述,为今后国内类似桥梁工程设计与施工提供了有益的参考。 In view of the physical background of the open waters such as the high wind and large waves, construction method of "prefabricate in factory and install at site" is adopted to effectively reduce the time of maritime operations and improve construction efficiency. In this paper, the non-navigation bridge of Hong Kong-Zhuhai-Macao Bridge is taken as an example, detailed elaboration about the key technologies for assembly construction of foundation is made from the aspects of fabricated base and joint part between pile and cap, which will provide a useful reference of domestic similar bridge engineering design and construction in future.
出处 《公路》 北大核心 2014年第10期30-36,共7页 Highway
基金 国家科技支撑计划 项目编号2011BAG07B03
关键词 跨海桥梁 埋置式基础 装配化施工 钢管复合桩 墩台安装 后浇孔连接 sea-crossing bridge buried foundation assembly of construction steel composite pile pier and abutment installation post cast hole connection
  • 相关文献

参考文献7

  • 1中交公路规划设计院有限公司.港珠澳大桥非通航孔桥施工图设计文件[M].2012.
  • 2林一宁,陈爱萍.跨海大桥的预制构件法施工[J].世界桥梁,2002,30(4):12-16. 被引量:9
  • 3中交第二航务工程局有限公司.跨海桥梁埋置承台足尺模型工艺试验及工艺优化研究报告[R].2012.
  • 4Q H Wu,W Tian,Z Z QIU,Z Liu. Analysis on Foun- dation Excavation Side Slope Stability and Over-Break Depth of Embedded Pile Cap in HZM Bridge [D]. Ad-vances in Civil Endineering l] ,2012 : 1697- 1703.
  • 5J B Liu,W Tian ,Q H Wu. Research on Water-stop System of HZM Bridge Precast Pile Cap Installation [D]. Advances in Civil Endineering lI ,2012: 1503- 1509.
  • 6F Q Chen,W Tian, L S Qin. Research on Hoisting E- quipment of Pre- Fabricated Abutment and Pier in Hong Kong-Zhuhai_Macao Bridge[D]. Advances in Civil Endineering 11 , 2012 : 1609- 1614.
  • 7H Zhong , W Tian, Q Guo. Research on pile- sinking system of Steel Pipe Pile in full size model process test of HZM Bridge [D]. Advances in Civil Endineering II , 2012-1591-1596.

二级参考文献7

  • 1龚志刚.大贝耳特海峡联络线中的西桥[J].国外桥梁,1994(2):154-156. 被引量:2
  • 2森儿峯夫.SEEE社社長C DELAGE博士來日講演會概要[J].橘梁,1994,30(7):33-56.
  • 3[2]M S Fletcher,Y Maury,D H Mizon. A New Crossion of the Severn[C]. Bridges into the zist Century, Hong Kong. 1995.415~ 423.
  • 4[4]Klaus Ostenfeld. Design of the Great Belt East Bridge[J]. Structural Engineering International, 1995,5 (4): 218 ~ 220.
  • 5[5]Russ Swan. Ice - breaker[J]. Bridge Design & Engineering, 1995,(1):64~70.
  • 6[7]Lars Hauge, Anton Petersen. Detailed Design of the φresund Bridge[J]. Structural Engineering International, 1999,9( 1 ): 39 ~ 44.
  • 7严国敏.诺森伯兰海峡大桥──加拿大的一座跨海特大桥的计划、设计与施工[J].国外桥梁,1997(2):6-9. 被引量:6