摘要
在企业管理中工作任务调度效率优化问题的研究中,由于在多任务的调度过程中,任务之间的关联性很复杂,受到相互之间调度顺序的影响较大。传统的工作任务调度模型以单一线性顺序最优为基础,一旦任务过多,会造成调度中不同任务调度相互矛盾加大,模型稳定性会下降,缺少灵活性,造成调度的效率不高。提出采用多约束调度模型的企业管理中多工作任务下合理调度方法。详细阐述了企业管理中多工作任务调度的原理,构建AON网络模型,针对网络模型进行虚调度,在求解空间中搜索最优解,得到企业管理中多任务合理调度方法。实验结果表明,利用改进算法进行企业管理中多工作任务调度,能够提高资源利用率,并且提高调度效率,避免多工作掺杂的情况下造成的调度模型稳定性降低的缺陷。
A reasonable scheduling method is proposed in the paper by using multiple constraint scheduling model under multiple work tasks in enterprise management. The principle of multiple work tasks scheduling in enterprise management was elaborated and the AON network model was constructed. For this network model, the virtual sched- uling was made. The optimal solution was searched in the solution space, to build the reasonable scheduling method of multi - task in enterprise management. Experimental results show that using the improved algorithm for the multi- ple work tasks scheduling in enterprise management, can improve the resource utilization rate, and the efficiency of the scheduling, and avoid the defect of the reduced stability of the scheduling model in the case of multiple work doped.
出处
《计算机仿真》
CSCD
北大核心
2014年第10期450-454,共5页
Computer Simulation
关键词
企业管理
工作任务
约束条件
Enterprise management
Work tasks
Constraint condition