火电EPC总承包项目物资采购管理探析 被引量:2

Analysis of Purchasing Management in EPC Project of Thermal Power Plants
下载PDF
导出
摘要 目前,工程EPC总承包是国内外工程承包市场上广泛应用的一种承包方式,是指一家总承包商(或联合体)对整个工程的设计、采购、施工、试运行直到交付使用的全过程"交钥匙"承包。而物资采购管理工作对于EPC总承包项目至关重要,直接关系着工程的进度、质量和效益。本文结合工程总承包项目物资采购管理的特点与现状,探析了设计、采购与施工环节的物资采购管理应着重加强的工作,提出了改进措施,以提高总承包项目物资采购管理的水平。 Currently, tumkey EPC is widely used in domestic and international engineering contracting market approach. Turnkey EPC refers to a general contractor (or consortium ) be responsible for the design, procurement, construction and commissioning of the entire project until the delivery of the entire process "turnkey". The material procurement management is essential for EPC Project, for its directly related to the progress, quality and efficiency of the project. Combing the characteristics and status of EPC projects of purchasing management, this paper explores the work that should be focused on in design, procurement and construction materials procurement and management aspects. Improvement measures that can raise the level of general contracting project materials procurement management is proposed.
作者 尹坤
出处 《应用能源技术》 2014年第10期15-17,共3页 Applied Energy Technology
关键词 物资采购管理特点与现状 改进措施 Characteristics and status of purchasing management Improvement measures
  • 相关文献

参考文献4

二级参考文献10

  • 1郭庆军,何晖.工程施工网络计划中工期-成本优化方案[J].基建优化,2005,26(5):22-24. 被引量:5
  • 2Mckim R, Hegazy T, Attalla M. Project performance control in reconstruction projects [ J ]. Journal of Construction Engineering and Management ,2000,126(2 ) : 137 - 141.
  • 3Salem O, Solomon J, Genaidy A, et al. Site implementation and assessment of lean construction techniques [ J ]. Leans Construction Journal ,2005,3 ( 2 ) : 1 - 12.
  • 4Oliveros A V O, Fayek A R. Fuzzy logic approach for activity delay analysis and schedule updating [ J ]. Journal of Construction Engineering and Management,2005,131 ( 1 ) :42 - 51.
  • 5Nassar K H. Developing a complexity measure for project schedules [J]. Journal of Construction Eng/needng and Maitagement,2006, 132(6) :554 -561.
  • 6Williams T. Assessing extension of time delays on major projects [ J ]. International Journal of Project Management,2003 (21 ) :19 - 26.
  • 7Bormal P, Goure D, Lacoste G. Where do we stand with fuzzy project scheduling [ J ]. Journal of Construction Engineering and Management,2004,130( 1 ] :114 - 123.
  • 8张仕廉,蒋亚鹏.建筑施工中工期安全水平评价[J].施工技术(下半月),2011,40(2):48-50. 被引量:4
  • 9周晓冬,王爽.基于低碳理念EPC总承包商资格预审评价模型构建研究[J].森林工程,2012,28(3):74-77. 被引量:5
  • 10李平,顾新一.PERT网络工期风险计算方法的研究[J].统计与决策,2004,20(5):16-17. 被引量:17

共引文献7

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部