摘要
以某尾矿库工程为例,介绍其采用箱型坝体取代传统的土石坝以及堆石坝作为尾矿坝,并在箱型坝体上设置溢洪道。随着尾砂面的上升,通过安放叠梁闸门来控制尾矿库的水体澄清及排放。
Taking certain tailings storage engineering as an example, the paper introduces that box dam body will be adopted to replace traditional earth and rockfill dam and rockfill dam will be acted as tailings dam, spillway will be arranged at box dam body.With the ascent of tailings surface, stop log will be installed to control water clarification and drainage of tailings storage.
出处
《有色冶金设计与研究》
2014年第5期13-14,共2页
Nonferrous Metals Engineering & Research
基金
赣鄱英才555工程领军人才培养计划项目
关键词
箱型坝
尾矿库
叠梁闸门
box dam
tailings storage
stop log