一起220kV线路跳闸事件分析 被引量:1

The Analysis on 220kV Transmission Line Tripping Event
原文传递
导出
摘要 分析了某220kV输电线路单相高阻接地故障时线路保护、断路器重合闸的动作行为,找到了引起220kV线路跳闸的原因,发现了线路故障的故障点,因光缆绑扎线断开后随风飘荡,造成绑扎带短接电气间隙对塔身放电所致。提出了加强对钢管塔易挂物、夹物点进行滑脱处理,预防飘浮物夹挂短接空气间隙的设计方案。并拟将"禁止采用不锈钢扎带固定光缆引下线"作为《十八项电网重大反事故措施》的一项补充内容。 Analysis of a certain 220 kV transmission line single-phase high resistance grounding fault line protection, circuit breaker reclosing behavior, founding the cause of 220 kV line tripping line fault points, because of the cable tie is broken after blowing in the wind, causing binding with electrical clearance of tower body discharge due to short, put forward to strengthen the hanging steel pipe tower is easy, clamp slippage processing point, prevention of float clamp short answer the design scheme of air gap. And the proposed "no stainless steel cable tie fixed cable down lead" as the grid 18 major anti-accident measures an added content.
出处 《河南电力》 2014年第3期8-9,共2页 Henan Electric Power
关键词 线路故障 光纤纵联差动保护 光缆扎带 反措 Line fault The optical longitudinal differential protection Cable tie Counter measures
  • 相关文献

参考文献1

二级参考文献7

  • 1DL/T559-2007,220kV-750kV电网继电保护装置运行整定规程[S].
  • 2国家电力调度通信中心.电力系统继电保护技术问答[M].第2版.北京:中国电力出版社,1999.
  • 3上海超高压输变电公司.变电设备检修[M].北京:中国电力出版社.2008.
  • 4彭志源.发电厂(站)设备安装与故障检测检修技术标准规范[M].北京:科学技术出版社,2003.
  • 5国家电力调度通讯中心.电力系统继电保护规定汇编[M].第2版.北京:中国电力出版社,2003.
  • 6DL/T596-1996.电力设备预防性试验规程[S].[S].,..
  • 7DL408-1991,电业安全工作规程[S].

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部