浅谈山区弱风化带嵌岩桩基础开挖施工技术

Brief Discussion on Construction Techniques for Footing Excavation of Socketed Piles in Moderate Weathering Regions of Mountainous Areas
下载PDF
导出
摘要 结合贵州省新建织金至纳雍铁路Ⅱ标卡拉河大桥3#和4#主墩嵌固桩基础开挖的施工生产实践,对山区弱风化带矩形大体积基础小爆破碎裂开挖法及钢筋混凝土护壁施工工艺进行研究,在保证坑壁规则整齐、不震裂、不超挖、每循环护壁施工周期短的情况下,施工进度及效益均取得良好效果,在类似工程中具有一定的借鉴意义。 Based on construction production practice of footing excavation of socketed piles of the No.3 and No.4 main piers of Kara River Bridge on the second section of newly established Zhijin-Nayong railway,rectangular and bulked light blasting fragmentation method for footing excavation and reinforced concrete dado construction technology were studied. When wall of holes are regular and tidy without shattered crack or over excavation and construction period of each circular dado is short,the engineering achieves good construction progress and effectiveness,and these can be taken as reference by similar projects.
作者 王福军
出处 《铁道建筑技术》 2014年第9期35-37,44,共4页 Railway Construction Technology
关键词 铁路桥梁 弱风化带 嵌固桩 爆破开挖 railway bridge moderate weathering regions socketed piles blasting excavation
  • 相关文献

参考文献2

二级参考文献8

  • 1王昆.嵌岩灌注桩在大桥主墩基础施工中的应用[J].筑路机械与施工机械化,2005,22(2):38-39. 被引量:5
  • 2TB100025-2005,铁路桥涵地基和基础设计基本规范[S].
  • 3顾毅.成爆破工程施工与安全[M].北京:冶金工业出社,2004.
  • 4黄绳武.桥梁施工及组织管理[M].北京:人民交通出版社,2000..
  • 5TB10210-2001.铁路混凝土与砌体工程施工规范[S].[S].,..
  • 6TB10002.1-2005,铁路桥涵设计基本规范[S].
  • 7周水兴,何兆益,邹毅松.路桥计算手册[M].北京:人民交通出版社,2001.178.
  • 8陈建,袁航新.虎头山大桥沉井基础施工技术简介[J].筑路机械与施工机械化,2000,17(6):32-34. 被引量:1

共引文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部