摘要
该文介绍了龙山路雨污合建泵站的改造工程设计。首先,分析了泵站现状存在的问题。接着,通过新技术、新设备等"四新技术"的采用,解决了泵站改造中的难题。其成果可供其他泵站改造项目设计借鉴。
This paper introduces the reconstruction engineering design of Longshan Road Rainwater and Sewage Combined Pumping Station, and analyzes the existing problems in the present pumping station.Through the adoption of the 'four new technologies' including the new technology and new equipment, the difficulties are solved in the reconstruction of pumping station. The effects can be referred for the design of the other pumping station reconstruction projects.
出处
《城市道桥与防洪》
2014年第7期260-263,共4页
Urban Roads Bridges & Flood Control
关键词
全地下式
雨污合建泵站
改造工程设计
四新技术
underground,rainwater and sewage combined pumping station,reconstruction design,four new technologies