施工导流方案动态交互协商决策 被引量:3

Dynamic-interactive negotiation decision making of construction diversion schemes
原文传递
导出
摘要 施工导流方案的选择需要业主、设计和施工单位通过协商实现.针对协商过程的动态性和交互性,基于群组风险决策理论,建立促进方案决策螺旋推进的交互模型.采用加权平均算子集结决策者的评价信息,以决策者评价与群体评价一致作为交互决策的目标导向,通过自适应迭代模拟决策者之间的协商过程,挖掘决策者最优价值的评价信息.在此基础上,计算各导流方案的得分函数和精确函数,据此进行导流方案的优劣排序.实例验证了该方法的可行性和有效性,可为交互协商视角下导流方案的优选提供理论基础. For the achievement of the construction diversion scheme selection, the negotiation between owner, designer and constructor are demanded. In allusion to the dynamics and interaction of the ne- gotiation process, the interactive decision making model promoting decision system to propel helically is proposed based on the group decision making under risk. By adopting the weighted averaging operator, the preference of individual is aggregated and by employing the adaptive iterative algorithm, the negotiation process of decision-makers is simulated. And the optimal individual preference value is derived targeting the consensus between the individual preferences and the collective ones. On the basis, the score function and accuracy function of the diversion schemes are calculated and accordingly the priority order of schemes are conducted. A case study is presented to verify the feasibility and validity of the method. The study provides theory foundation for diversion schemes optimization in view of interactive negotiation.
出处 《系统工程理论与实践》 EI CSSCI CSCD 北大核心 2014年第11期2995-3000,共6页 Systems Engineering-Theory & Practice
基金 国家自然科学基金(51279137 51379164) 中央高校基本科研业务费专项资金(2012206020210)
关键词 施工导流 方案决策 直觉模糊 自适应迭代 动态交互 群决策 construction diversion schemes decision intuitionistic fuzzy adaptive iterative algorithm dynamic interaction group decision
  • 相关文献

参考文献16

  • 1胡志根,刘全,贺昌海,肖焕雄,周宜红,傅峥,李定葵.水利水电工程施工初期导流标准多目标风险决策研究[J].中国工程科学,2001,3(8):58-63. 被引量:33
  • 2Afshar A, Rasekh A, Afshar M H. Risk-based optimization of large flood-diversion systems using genetic algo- rithms[J]. Engineering Optimization, 2009, 41(3): 259-273.
  • 3Rasekh A, Afshar A, Afshar M H. Risk-Cost optimization of hydraulic structures: Methodology and case study[J]. Water Resources Management, 2010, 24(11): 2833 -2851.
  • 4薛进平,胡志根,刘全.基于决策主体多元性的施工导流方案优选[J].武汉大学学报(工学版),2012,45(3):282-284. 被引量:8
  • 5Karimi S M, Mousavi S J, Kaveh A, et al. Fuzzy optimization model for earthwork allocations with imprecise parameters[J]. Journal of Construction Engineering and Management, 2007, 133(2): 181- 190.
  • 6徐玖平,李姣.大型水利水电工程建设项目动态联盟组织模式的结构集成[J].系统工程理论与实践,2012,32(11):2447-2458. 被引量:18
  • 7Atanassov K T. Two theorems for intuitionistic fuzzy sets[J]. Fuzzy Sets and Systems, 2000, 110(2): 267-269.
  • 8Hashemi H, Bazargan J, Mousavi S M. A compromise ratio method with an application to water resources management: An intuitionistic fuzzy set[J]. Water Resources Management, 2013, 27(7): 2029-2051.
  • 9Ying L C. An approach to evaluating the landscape design projects with intuitionistic fuzzy information[J]. International Journal of Digital Content Technology and its Applications, 2012, 6(20): 590-596.
  • 10Xu Z, Yager R R. Some geometric aggregation operators based on intuitionistie fuzzy sets[J]. International Journal of General Systems, 2006, 35(4): 417-433.

二级参考文献25

共引文献54

同被引文献33

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部