结合云霄翔球广场一期工程扣件式钢管外脚手架搭设实例,施工单位进行图纸自审并拟定搭设方案时对其所支承的2#楼裙楼屋面板原结构及其配筋进行验算,发现该楼板不能承受外脚手架荷载,故在图纸会审时及时提出该问题,由设计院进行变更修改,避免后续质量事故的产生。
Before erecting of fastener- style steel tube outside scaffolds in Yunxiao Flying Globe Square I project, the construction enterprise checked original stucture and reinforcement of the roof board of 2# building. It is found that the roof board can' t bear the load of outside scaffohts. As the results of found problem posing in joint checkup of drawing, the probable occurrenee quality accident was avoided by design modification.
出处
《福建建筑》
2014年第10期58-59,67,共3页
Fujian Architecture & Construction
关键词
图纸自审
图纸会审
结构验算
配筋验算
Drawing self- review
Joint checkup of drawing
Structural checking computation
Reinforcement checking calculation