大电网经济评估软件开发及应用 被引量:1

Large Power Grid Economic Evaluation Software Design and Its Application
下载PDF
导出
摘要 介绍了新开发的大电网经济性评价分析软件,并使用该软件对规划的2020年特高压交直流进行经济性评估。该软件具有数据管理、成本与效益计算、财务评价、国民经济评价、灵敏度分析和电价竞争力计算等功能。软件使用了一些最新的大电网经济评价理论,其核心模型是三维全寿命周期成本(LCC)模型、综合效益模型和输电分摊模型,并具有综合效益财务评价、国民经济评价、灵敏度分析和电价竞争力计算等功能。软件采用直接启发式算法,实现经济评价中各模块的计算。该软件具有友好的输入和输出界面,能够图文并茂地反映出大电网经济评价结果。 This paper mainly introduces the economic evaluation and analysis software which is newly exploited for large power grid ,and the software is used on the planning of 2020 UHV AC and DC for economic evalua-tion.The software has the functions of data management,cost and benefit calculations,financial evaluation, economic evaluation,sensitivity analysis and tariff competitiveness calculation.Some of the latest economic e-valuation theories for large power grid is applied on this software .The core models are consisted of three-di-mensional life cycle cost (LCC)model,comprehensive benefit model and transmission allocation model.This software uses direct heuristic algorithm as the main algorithm to achieve the economic evaluations of each mod-ule.Friendly inputs and outputs interfaces are achieved on the software so as to the results of economic evalua-tion for large power grid can be illustrated directly.
出处 《电力与能源》 2014年第5期560-565,共6页 Power & Energy
基金 2012国家电网公司科学技术项目(SGCC-MPLG018-2012)
关键词 大电网经济性评价分析软件 全寿命周期成本 效益 财务评价 国民经济评价 灵敏度分析 电价竞争力 Large power grid economic evaluation software Life cycle cost Benefit Financial evaluation Economic evaluation Sensitivity analysis Tariff competitiveness illustrated directly
  • 相关文献

参考文献17

  • 1Zhou Kongjun,Li Haijun,Hou Xingzhe. The application of LCC theory on the watthour meter management[A].2006.1-8.
  • 2Christoph Meyer,Rik W.De Doncker. LCC analysis of different resonant circuits and solid-state circuit breakers for medium-voltage grids[J].IEEE Transactions on Power Delivery,2006,(03):1414-1420.
  • 3Zhu Hong,Hu Wenping. An instance based on a 3-dimen-sional model of life cycle cost for overhead lines[A].2010.431-434.
  • 4Eleftherios I. Amoiralis,Marina A. Tsil,Pavlos S. Georgilakis. Energy efficient transformer selection implementing life cycle costs and environmental externali-ties[A].2007.1-6.
  • 5Li Wang,Tai-Her Yeh,We-Jen Lee. Benefit evalua-tion of wind turbine generatiors in wind farms using capaci-ty-factor analysis and economic-cost methods[J].IEEE Transactions on Power Systems,2009,(02):692-704.
  • 6于会萍,刘继东,程浩忠,陈章潮,马则良.电网规划方案的成本效益分析与评价研究[J].电网技术,2001,25(7):32-35. 被引量:49
  • 7Amoiralis,E.I,Tsili,M.A,Kladas,A.G. Power transformer economic evaluation in decentralized electricity markets[J].IEEE Transactions on Industrial Electronics,2012,(05):2329-2341.
  • 8Hesamzadeh,M R,Hosseinzadeh,N,Wolfs,P J. Econom-ic assessment of transmission expansion projects in competi-tive electricity markets "an analytical review[A].2008.
  • 9Mutale.J,Strbac.G. Transmission network reinforce-ment versus FACTS:an economic assessment[J].IEEE Transactions on Power Systems,2000,(03):961-967.
  • 10金广厚,宋建永,程晓荣.基于模糊神经网络的电能质量指标的经济性评估[J].电力系统及其自动化学报,2004,16(6):18-23. 被引量:32

二级参考文献34

共引文献163

同被引文献8

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部