乌东德水电站左岸尾水洞出口边坡稳定性评价 被引量:2

Stability evaluation on tailrace outlet slope at left bank of Wudongde Hydropower Station
下载PDF
导出
摘要 金沙江乌东德水电站左岸尾水出口边坡为陡倾顺向坡,边坡下部顺向坡切脚的同时尾水洞开挖亦为边坡变形提供了条件。为评价该顺向坡的稳定性,通过工程地质调查、变形监测、物探检测相结合的研究手段,对边坡稳定性分层次进行了综合研究,查明了边坡变形的原因与机理。研究结果可为设计方案的制定提供依据,为类似边坡稳定性的研究工作提供了宝贵的经验。 The slope at tailrace outlet on left bank of Wudongde Hydropower Station is steep consequent slope. The corner cut of the lower part of the consequent slope together with the excavation of tailrace create favorable conditions for slope deformation. In order to evaluate the stability of the slope, the comprehensive research is conducted hierarchically through engineering geolog- ical survey, deformation monitoring and geophysical detection. And the causes and mechanism for slope deformation are re- vealed, which provides basis for drawing up the design scheme.
出处 《人民长江》 北大核心 2014年第20期51-53,63,共4页 Yangtze River
关键词 顺向坡 切脚 采空 变形机理 乌东德水电站 consequent slope corner cut mined out deformation mechanism Wudongde Hydropower Station
  • 相关文献

参考文献2

  • 1黄孝泉,王吉亮.金沙江鸟东德水电站左岸尾水出口边坡变形分析及加固方案专题报告[R].武汉:长江勘测规划设计研究有限责任公司,2014.
  • 2薛果夫,李会中,黄孝泉.金沙江乌东德水电站可行性研究报告第四篇:工程地质[R].武汉:长江勘测规划设计研究有限责任公司.2011.

同被引文献23

引证文献2

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部