沈阳浑南现代有轨电车一期工程BT建设管理研究

Study on BT Construction Management Mode of the Firs-stage Modern Tram Project of Hunnan District of Shenyang
下载PDF
导出
摘要 分析沈阳浑南现代有轨电车一期工程采用BT模式投资建设的条件,总结项目采用BT模式建设的要点,从工期、质量、成本以及车辆供应4个方面研究BT模式在本项目中的建设管理优势,提出该模式的3个创新点:双业主均衡管理模式、施工二次招标、回购资金资产证券化。 The requirements of investment construction by using BT mode to implement the Hunnan tram project were analyzed in this paper. The key points of the BT mode operation were summarized. The advantages of the BT mode construction management of the project were studied from four aspects: schedule,quality, cost and vehicle supplement. Three innovations as double owners management mode,twice bid for construction bidding,and repurchased capital asset securitization of the project were summarized.
作者 王汉军
出处 《都市快轨交通》 北大核心 2014年第5期13-16,27,共5页 Urban Rapid Rail Transit
关键词 BT模式 现代有轨电车 建设管理优势 创新 BT (build-transfer) mode modem tram advantages of construction management innovations
  • 相关文献

参考文献7

二级参考文献24

  • 1唐淼,马韵.现代有轨电车在城市区域内的适应性[J].上海交通大学学报,2011,45(S1):71-75. 被引量:37
  • 2上海市隧道工程轨道交通设计研究院.CJJ/T 114-2007城市轨道交通设计规范[S].上海:上海市建设工程标准定额管理总站,2007.
  • 3沈阳浑南现代交通有限公司.沈阳市浑南新区现代有轨电车一期工程招标文件[G].沈阳,2012.
  • 4北京城建设计研究总院有限责任公司.沈阳市浑南新区现代有轨电车一期工程可行性研究报告[R].北京,2012.
  • 5北京城建设计研究总院有限责任公司.沈阳市浑南新区现代有轨电车一期工程初步设计[G].北京,2012.
  • 6北京城建设计研究总院有限责任公司.沈阳市浑南新区现代有轨电车一期工程l、2、3、5号线工程可行性研究报告[R].沈阳,2011.
  • 7北京城建设计研究总院有限责任公司.沈阳市浑南新区现代有轨电车一期工程l、2、3、5号线初步设计[G].沈阳.2013.
  • 8北京城建设计研究总院有限责任公司.沈阳市浑南新区现代有轨电车一期工程1、2、3、5号线车辆技术规格书[G].沈阳,2012.
  • 9Jecmg W, Kwon S B,Park D. Efficient Energy Management for Onboard Battery-driven Light Railway Vehicle [ C ]// WCRR. Lille, France,2011.
  • 10Lukic S M, Cao Jian, Emadi A. Energy Storage Systems for AuLomotive Applications[ J]. 1EEE Transactions on Industr- ial Electronics,2008, 55 (6) : 2258 - 2267.

共引文献54

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部