就大型钢结构栈桥吊装施工组织进行了研究,阐述了吊车行走路线与吊车站位的设计方法,并对大型钢结构栈桥吊装施工现场出现的问题进行了分析,提出了具体的处理措施,以提高钢结构栈桥吊装的施工技术水平。
The paper researches the hoisting construction organization of large steel structure trestles,illustrates the design methods for the crane’s route and its position,analyzes some problems at the hoisting construction sites of the trestles,and points out some factual treatment,so as to improve the construction technique of the steel structure trestle hoisting.
出处
《山西建筑》
2014年第32期96-97,共2页
Shanxi Architecture
关键词
钢结构
吊装技术
施工组织
steel structure
hoisting technique
construction organization