摘要 传统方式下的超大型鼠笼式三相异步电动机设计,为了提高启动能力往往会牺牲掉效率、温升、体积重量、甚至成本。近年来针对超大型三相异步电动机的专用调速器(Adjustable-Speed Drive,简称:ASD)应运而生并开始应用,但针对ASD的高性价比的电动机的设计制造相对落后,一手的试验比较数据更加缺乏。如同变频器促进了专用的变频调速型的中小型三相异步电动机的设计一样,本文针对ASD应用的超大型鼠笼式三相异步电动机,从该类电动机关键的启动分析入手,以损耗与效率为关注重点,通过火电厂给水泵用3MW的ASD型超大鼠笼式三相异步电动机的试验比较分析,得出具有参考价值的试验数据及结论。 The traditional methods of super large squirrel-cage three-phase asynchronous motor design, in order to improve the capacity to start, will tend to sacrifice efficiency, temperature, volume, weight and cost. In recent years, Adjustable-Speed Drive(abbreviation: ASD) of very large three-phase asynchronous motor special governor began to be used and mature. As the converter promoted the special frequency control type small three-phase ifiduction motor design, according to the ASD application of super large squirrel-cage three-phase asynchronous motor design is not mature. This article analyzes the key of the motor firstly with efficiency as the core index. By design and experimental comparison and analysis of 3MW super squirrel-cage three-phase asynchronous motor of ASD drive, reached the high starting performance, low efficiency, small volume and weight, lower cost. This paper will give designers of asynchronous motor provide some experience.
出处 《大电机技术》 北大核心 2014年第5期14-17,57,共5页 Large Electric Machine and Hydraulic Turbine
关键词 超大型异步电动机 调速器 效率 损耗 启动电流与转矩 试验研究 super large induction motors adjustable-speed drive (ASD) efficiency loss startingcurrent and torque test research
  • 相关文献

参考文献12

二级参考文献36

  • 1王洪涛,刘玉田,邱夕照.基于分层案例推理的黑启动决策支持系统[J].电力系统自动化,2004,28(11):49-52. 被引量:45
  • 2高越农.大容量电动机磁控软起动[J].武汉科技大学学报,2005,28(1):87-89. 被引量:12
  • 3潘学萍.水力系统与电力系统相互影响研究[J].电力自动化设备,2005,25(12):31-34. 被引量:2
  • 4严奉军,王宁.电厂黑启动方案及其系统试验[J].电力自动化设备,2007,27(1):122-125. 被引量:11
  • 5程福秀.现代电机设计[M].北京:机械工业出版社,1992..
  • 6ADIBI M M,FINK L H. Overcoming restoration challenges associated with major power system disturbances restoration from cascading failures[J]. IEEE Power and Energy Magazine, 2006,4(5) :68-77.
  • 7FINK L H,LIOU Kanlee,LIU Chenching. From generic restoration actions to specific restoration strategies[J]. IEEE Trans on Power Systems, 1995,10(2) :745 -752.
  • 8ADIBI M M,BORKOSKI J N,KAFKA R J,et al. Frequency response of prime movers during restoration[J]. IEEE Trans on Power Systems, 1999,14(2) :751-756.
  • 9ROGERS G J,SHIRMOHAMMADJ D. Induction machine modeling for electromagnetic transient program[J]. IEEE Trans on Energy Conversion, 1987,2 (4) :622- 627.
  • 10ADIBI M,CLELLAND P,FINK L,et al. Power system restoration -a task force report [ J ]. IEEE Trans on Power Systems, 1987,2(2) :271-277.

共引文献15

同被引文献6

引证文献1

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部