240m高钢筋混凝土烟囱爆破拆除及振动控制技术 被引量:6

BLASTING DEMOLITION OF A 240M HIGH REINFORCED CONCRETE CHIMNEY AND THE VIBRATION CONTROL TECHNOLOGY
下载PDF
导出
摘要 针对复杂环境下240m高钢筋混凝土烟囱定向爆破拆除项目,通过采用延时爆破技术、开挖减振沟和铺设黄土缓冲垫层等一系列防护措施对振动进行控制,并对爆破振动进行了监测分析,有效控制了爆破振动的影响,减振效果显著,可为同类拆除爆破工程提供参考。 The blasting demolition project of 240m high reinforced concrete chimney in complex environment was introduced. The vibration was controlled through a series of protective measures such as delay blasting technology, digging damping ditches and laying loess cushions. The blasting vibration monitoring data was analyzed also. Affects of blasting vibration were effectively controlled and the effect was significant. It could provide a reference for similar demolition blasting engineerings.
出处 《工程爆破》 北大核心 2014年第5期18-22,共5页 Engineering Blasting
关键词 钢筋混凝土烟囱 爆破拆除 防护措施 振动控制 Reinforced concrete chimney Blasting demolition Protective measures Vibration control
  • 相关文献

参考文献8

二级参考文献35

共引文献480

同被引文献38

引证文献6

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部