为规避风险,实现企业增效,以国际工程"交钥匙"项目为例,从清单编制原则、清单特征描述、清单工程量、清单漏项、重复校核等方面讨论了国际工程EPC合同模式下对工程量清单校核的重要性。
Workload list checking is of great importance for international projects in "Deliver Keys" mode to avoid risks and increase efficiency. The importance of workload list checking for international projects in EPC (Engineering, Procurement and Construction) mode are discussed from the aspects of principles of list preparation, characteristics of the list, list workload, item lacking and repeated checking.
出处
《水电与新能源》
2014年第10期57-58,共2页
Hydropower and New Energy