摘要
结合巴基斯坦第1风力发电项目,介绍了在风力发电机基座混凝土施工中,所采取的各项温度控制措施。结果表明,本项目所采取的温控措施,有效地防止了混凝土裂缝的产生,保证了工程质量。
Some temperature control techniques adopted in the concrete construction of generator foundation in the No. 1 wind power project in Pakistan are introduced. Practice shows that temperature -induced cracks in the concrete are elfectively prevented by adopting such techniques and good quality of the concrete construction is ensured.
出处
《水电与新能源》
2014年第10期71-73,共3页
Hydropower and New Energy
关键词
风力发电
发电机机墩
混凝土施工
温度控制
wind power
generator base
concrete construction
temperature control