摘要
对大机组建设过程中利用小机组冷却塔的可行性进行了研究。利用旧的小机组冷却塔后缩短了施工工期,降低了工程造价。
The feasibility of utilizing old smaller cooling tower in the construction pro-cess of large thermal power unit was studied. Utilization of old small cooling tower not only shortened the construction period but also reduced the project cost.
出处
《冶金动力》
2014年第12期49-51,共3页
Metallurgical Power
关键词
自然通风双曲线冷却塔
循环水泵
利旧
natural ventilation hyperbolic cooling tower
circulating water pump
utilizing old device