摘要
介绍3#柴油加氢DCS系统的升级与远程搬迁,主要从DCS系统升级前后的系统配置、升级后MESH网络的应用特点、系统搬迁方案及搬迁过程中问题解决、时钟同步功能、与SIS系统通讯等方面进行阐述。
Introducts 3# diesel hydrogenation DCS system upgrades and remote relocations, mainly from the system before and after the upgrade DCS system configuration, application features of the upgraded MESH network, system relocation programs and other aspects of the process of problem solving elaborate, GPS Timesync, communicates with SIS.
出处
《广东化工》
CAS
2014年第20期109-110,118,共3页
Guangdong Chemical Industry