摘要
南钢2×220 m2烧结总包项目,总包公司依靠专有技术,实施项目经理责任制,精心项目策划,科学管理,用最短的工期,最少的投资,全面达到总承包合同规定的各项要求。
In view of 2 × 220 m^2 sinter machine EPC project of Nangang Iron Steel Co.,Ltd.,the general contracting company relied on proprietary technology and implemented the project manager responsibility system with elaborate project planning,scientific management,the shortest working period and the least investment,and fully met the requirements specified in the EPC contract.
出处
《工程建设》
2014年第5期59-62,共4页
Engineering Construction
关键词
工程总承包
烧结
项目管理
EPC project contracting
sintering
project management