摘要 分析一起造成线路元件严重损坏的35 kV线路故障原因并提出防范措施。通过运用多专业知识综合分析判断录波图与故障现象、设备损坏之间的有机联系,判断35 kV金百线发生的是相间接地短路故障而不是普通单相接地故障。针对事故过程暴露出的线路避雷器安装位置错误等问题,提出了35 kV及以下中性点不直接接地系统应选择其中一相线路不安装线路避雷器等防范措施。 The reason of a 35 kV line fault which caused severe damages of line components are analyzed and preventive measures are proposed. Organic relations among recorder graphs, fault phonemes and damage devices are analyzed and judged comprehensively by applying multi professional knowledge. It is judged that the fault of 35 kV Jinbai line is not a simple single phase ground short circuit fault but an interphase ground short circuit fault. Aiming at problems exposed in the fault process such as the wrong installation position of line arrester and so on, preventive measures are proposed including one phase of the line should be chosen not to be installed the line arrester in the 35 kV and below voltage non-direct ground neutral system.
作者 陈波 谢海
出处 《广西电力》 2014年第5期39-42,共4页 Guangxi Electric Power
关键词 35 KV线路 相间接地短路 线路避雷器安装位置 中性点不直接接地系统 35 kV line interphase ground short circuit installation position of line an'ester non-direct ground neutral system
  • 相关文献

参考文献3

二级参考文献25

  • 1袁铁,郄秀书.卫星观测到的我国闪电活动的时空分布特征[J].高原气象,2004,23(4):488-494. 被引量:79
  • 2孙萍,郑庆均,吴璞三,周照宗,董宝骅.220kV新杭线Ⅰ回路27年雷电流幅值实测结果的技术分析[J].中国电力,2006,39(7):74-76. 被引量:34
  • 3杜澍春.关于输电线路防雷计算中若干参数及方法的修改建议[J].电网技术,1996,20(12):53-56. 被引量:73
  • 4Takami J, Okabe S. Observational results of lightning current on transmission towers[J]. IEEE Transactions on Power Delivery, 2007, 22(1): 547-556.
  • 5王道宏,郄秀书,郭昌明.雷电与人工引雷[M].上海:上海交通大学出版社,2000.
  • 6Anderson R B, Eriksson A J. Lightning parameters for engineering application [J].Electra, 1980, 39(69): 65-102.
  • 7IEEE Std 1410-1997 IEEE guide for improving the lightning performance of electric power overhead distribution lines[S], 1997.
  • 8Chen S M, Du Y, Fan L M, et al. A lightning location system in China: its performances and applications[J]. IEEE Transactions on Electromagnetic Compatibility, 2002, 44(4): 555-560.
  • 9CIGRE. Guide to procedure for estimating the lightning performance of transmission lines: CIGRE Brochure 63[R]. [S. l.]: CIGRE, 1991.
  • 10Anderson R B, Eriksson A J, Kroniger H, et al. Lightning and thunderstorm parameter[C]// IEE Conference Publication No. 236, Lightning and Power System. London, UK: IEE, 1984:57 -61.

共引文献66

同被引文献7

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部