该文介绍了凤凰山矿副井绞车减速器更换改造过程,包括施工前的准备、施工流程、安装标准及安全注意事项等,为绞车减速器的安装提供了参考。
This paper introduces the replacing process of the auxiliary shaft winch decelerator of Lantau Peak mine, including the preparation before construction, construction process, installation standards and safety precautions, which provide a reference for the winch reducer installation.
出处
《山东煤炭科技》
2014年第11期145-146,共2页
Shandong Coal Science and Technology
关键词
减速器
更换
改造
decelerator
replacement
reconstruction