期刊文献+

近距离煤层上行开采可行性研究 被引量:7

Feasibility Analysis on Upward Mining in Closed Distance Coal Seam Group
下载PDF
导出
摘要 根据小回沟煤矿8#和9#煤层特殊地质情况,对其上行开采可行性进行研究。通过采动影响系数法、三带判断法、围岩平衡法论证得出9#煤层采用房柱式开采后可以实现8#煤层蹬空开采。结合房柱式开采工艺理论要求及8#煤层长壁工作面向底板传递载荷计算分析合理设计9#煤层采留比,并运用FLAC3D数值模拟验证了理论分析的正确性。 According to the special geological conditions of Xiaohuigou coal mining of 8^#and 9^#coal seam to analysis on upward mining. Using the ratio judging method,3-zone discriminance, surrounding rock equilibrium method result that the 9^#coal seam with room and pillar mining method can be achieved after the8^#coal seam overhead mining. Combined with room and pillar mining technology theory and 8^#coal seam longwall face plate to transfer load calculation and analysis to the reasonable ratio of 9^#coal seam mining,using FLAC^3 Dnumerical simulation to verify the theoretical analysis is correct.
出处 《煤炭技术》 CAS 北大核心 2014年第10期147-150,共4页 Coal Technology
基金 山西省科技重大专项(20121101009-03)
关键词 上行开采 蹬空开采 房柱式 传递载荷 upward mining overhead mining room-and-pillar transmitted load
  • 相关文献

参考文献7

二级参考文献22

  • 1王明立,张玉卓,张金才.神府矿区大柳塔矿房柱式采煤法煤柱尺寸研究[J].煤矿现代化,1998,0(4):28-31. 被引量:3
  • 2苗喜明.依靠改革采煤方法提高资源回采率[J].煤炭企业管理,2005(10):65-65. 被引量:18
  • 3史元伟.液压支架初撑力及工作阻力的确定[J].煤炭学报,1985,(3).
  • 4陈炎光,钱鸣高.中国煤矿采围岩控制[M].徐州:中国矿业大学出版社,1994.
  • 5朱银昌,陈庆禄,张铁岗.复杂·难采煤层的开采[M].北京:世界图书出版公司,1998.
  • 6侯忠杰.厚沙下煤层覆岩破坏机理探讨.矿山压力与顶板管理,1994,(3):51-54.
  • 7钱鸣高,李鸿昌.采场上覆岩层运动及工作阻力的确定[R].徐州:煤炭工业部矿山压力情报中心,1984.
  • 8Xie Heping, Chen Zhonghui, Wang Jiachen. Three-dimensional nu- merical analysis of deformation and failure during top coal caving [ J~. International Journal of Rock Mechanics and Mining Sciences, 1999,36 ( 5 ) :661-670.
  • 9Itasca Consulting Group Inc. UDEC2D (4.0) User manual [ M ]. Minnesota, USA : Itasca Consulting Group Inc. ,2004.
  • 10钱鸣高 刘听成.矿山压力及其控制[M].北京:煤炭工业出版社,1989..

共引文献114

同被引文献29

引证文献7

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部