摘要
本文介绍了赣江生米九龙湖段防洪大堤工程以抛石碾压基床作为混凝土挡墙基础,在施工临水面和场地狭窄的情况下优于土石基础,节省了投资,缩短了施工工期,取得了一定的经济效益和社会效益,可以为类似工程提供借鉴.
The riprap rolling bedding which is adopted as the foundation of concrete retaining wall and applied in the flood control dyke of Jiulonghu reach of Ganjiang River in Shengmi town is introduced. It is better than the earth-rock foundation in the narrow construction ground and river side. It can save the investment and shorten the construction period. And the economic and social benefit is obtained. It can be referred for the similar projects.
出处
《江西水利科技》
2014年第3期204-207,共4页
Jiangxi Hydraulic Science & Technology
关键词
九龙湖防洪工程
抛石碾压基床
施工方法与运用
Jiulonghu flood control project
Riprap rolling bedding
Construction method and application