地铁隧道上方及两侧基坑开挖设计与施工技术研究 被引量:1

Study on Design and Construction of the Excavation of Foundation Pit above and on both Sides of the Subway Tunnel
下载PDF
导出
摘要 文章以南京火车站北广场基坑工程为背景,针对地铁上方及两侧均需进行基坑开挖的特殊情况,从设计、施工方面采取了相应的变形控制技术措施,并结合监测数据进一步优化、调整开挖顺序,补充反压措施,使地铁隧道变形控制在允许范围之内,为类似工程提供参考与借鉴。 Based on the foundation pit engineering of Nanjing Railway Station North Square, for the special case that the foundation pit above and on both sides of the subway tunnel has to be excavated, this paper elaborates some measures to limit the pit deformation during the design phase and construction phase.Furthermore, combined with the monitoring data, the excavation sequence has been optimized and counter measures are taken, so that the deformation of subway tunnel is controlled within the allowable range. This paper provides a reference for similar projects.
出处 《江苏建筑》 2014年第5期79-83,共5页 Jiangsu Construction
关键词 地铁隧道上方及两侧基坑开挖 开挖顺序 反压措施 excavation of foundation pit above and on both sides of the subway tunnel excavation sequence counter measures
  • 相关文献

参考文献5

二级参考文献22

  • 1王卫东,吴江斌,翁其平.基坑开挖卸载对地铁区间隧道影响的数值模拟[J].岩土力学,2004,25(z2):251-255. 被引量:235
  • 2师旭超,汪稔,韩阳.卸荷作用下淤泥变形规律的试验研究[J].岩土力学,2004,25(8):1259-1262. 被引量:17
  • 3陈郁,李永盛.基坑开挖卸荷引起下卧隧道隆起的计算方法[J].地下空间与工程学报,2005,1(1):91-94. 被引量:158
  • 4唐大雄 刘佑荣 张文殊 等.工程岩土学[M].北京:地质出版社,1999.6-77.
  • 5刘建航,候学渊主编.软土市政地下工程施工技术手册(对构筑物的影响与防治)[M].上海:上海市政工程局,1990.
  • 6夏明耀,戴余忠,刘建航.长条形深大基坑对周围土体移动的分析与治理[D].上海:同济大学,1991.
  • 7刘浩.上方卸荷对地下建构筑物的影响研究[D].上海:同济大学,2005.
  • 8北京地铁运营有限责任公司.北京地铁工务维修规则[S].北京:北京地铁运营有限责任公司,2009.
  • 9GB50007-2002.建筑地基基础设计规范[S].[S].,..
  • 10SZ-08-2000.上海地铁基坑工程施工规程[S].[S].上海市市政工程管理局,..

共引文献36

同被引文献7

引证文献1

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部