摘要
以瑞士勒奇山铁路隧道自动化系统为例,介绍在隧道发生灾害时,隧道自动化系统与信号列车运行控制系统的结合控制方式,由此引申探讨和研究未来我国铁路隧道自动化系统与CTCS结合配置的可能性。
Taking the railway tunnel automatic system of the Loetschberg base tunnel, Switzerland as an example, the paper introduces the combined control mode of the tunnel automatic system and train control system, and gives a further discussion and research on the feasibility of the combined confi guration of the railway tunnel automatic system and CTCS system in our country.
出处
《铁路通信信号工程技术》
2014年第5期77-79,共3页
Railway Signalling & Communication Engineering
关键词
隧道自动化
列控系统
结合控制
tunnel automation
train control system
combined control