期刊文献+

考虑价格限制与差价合约的发电容量投资分析 被引量:2

Study on power generation capacity investment with price limit and contracts for differences
原文传递
导出
摘要 论文针对差价合约电力市场,在考虑价格上下限条件下构建期权博弈模型,探讨寡头发电商的容量投资策略;然后运用数值仿真方法,考察不同差价合约和价格上限条件下的发电容量投资阈值和最优容量选择,并在此基础上,基于发电机组负荷率和电力市场勒拉指数讨论有效差价合约.研究表明:1)差价合约电量比重较少时,差价合约电价对投资策略几乎没影响,而差价合约电价较高时,随差价合约电量比重的递增,投资阈值和最优容量会出现跳跃式下降;2)存在"既能保障有效的电力供给,又能确保实现较高市场效率"的有效差价合约. With price limit and contracts for difference(CFD),this paper presents an oligopoly capacity investment model to explore power producers’ investment strategy.We simulate the model and investigate the investment threshold and optimal capacity choice under different CFDs and price cap conditions,and effective CFD is discussed with the criterion of power unit load ratio and Lerner index.The analysis result indicates,1) the impact of CFD price to investment strategy is little when the proportion of power in CFD is small,but the investment threshold and optimal capacity will jump downward with CFD power increasing when CFD price is higher.2) There is an effective CFD in some power market,which ensures adequate power supply and higher market efficiency.
作者 张新华 叶泽
出处 《系统工程理论与实践》 EI CSSCI CSCD 北大核心 2014年第9期2220-2227,共8页 Systems Engineering-Theory & Practice
基金 国家自然科学基金(71271033 70971012) 教育部新世纪优秀人才支持计划(NCET-11-0978) 湖南省高校创新平台开放基金(13K057)
关键词 差价合约 价格上限 容量投资 期权博弈 电力市场 contracts for difference(CFD) price cap capacity investment option game power market
  • 相关文献

参考文献11

  • 1张新华,赖明勇,叶泽.寡头发电商投资阈值与容量选择模型及其分析[J].中国管理科学,2010,18(5):106-112. 被引量:6
  • 2Murphy F H, Smeers Y. Generation capacity expansion in imperfectly competitive restructured electricity markets[J]. Operations Research, 2005, 53(4): 646-661.
  • 3Dixit A K, Pindyck R S. Investment under uncertainty[M]. Princeton University Press, 1994.
  • 4Botterud A, Korpas M. A stochastic dynamic model for optimal timing of investments in new generation capacity in restructured power systems[J]. Electrical Power and Energy Systems, 2007, 29(2): 163-174.
  • 5B?ckman T, Fleten S, Juliussen E, et al. Investment timing and optimal capacity choice for small hydropower projects[J]. European Journal of Operational Research, 2008, 190(1): 255-267.
  • 6Wang C H, Min K J. Electric power generation planning for interrelated projects: A real options approach[J]. IEEE Transactions on Engineering Management, 2006, 53(2): 312-322.
  • 7臧宝锋,胡汉辉,庄伟钢.双重随机不确定条件下的一次性容量扩展投资[J].管理科学学报,2007,10(3):37-43. 被引量:6
  • 8张新华,叶泽,赖明勇,谭圆圆.考虑价格上限的寡头发电投资阈值与容量选择[J].管理科学学报,2012,15(9):1-9. 被引量:8
  • 9Aguerrevere F L. Equilibrium investment strategies and output price behavior: A real-options approach[J]. The Review of Financial Studies, 2003, 16(3): 1239-1272.
  • 10Roques F A, Savva N. Investment under uncertainty with price ceilings in oligopolies[J]. Journal of Economic Dynamics & Control, 2009, 33(2): 507-524.

二级参考文献49

共引文献15

同被引文献12

引证文献2

二级引证文献45

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部